Doorsets and internal glazing
Doorsets and glazing, scheduled and installed as one package.
Doorsets and internal glazing are where a project's compliance paperwork usually falls apart: the wrong leaf in the wrong opening, ironmongery that was never part of the tested assembly, or a glazed screen fixed into a wall it was never tested against.
We schedule, supply and install doorsets and internal glazing as a controlled package, keeping the assembly, its ironmongery and its evidence together from order to handover.

Scope
What the package covers.
Typical applications
- Apartment and guest room entrance doorsets
- Office and meeting room doorsets
- Riser and service doors
- Internal glazed partitions and screens
- Frameless and structural glass elements
- Feature and oversized doors
Design inputs required
- Door and glazing schedules
- Fire, acoustic and security requirements per opening
- Ironmongery schedule and access control interfaces
- Wall types and structural openings
- Finish and veneer or paint specification
- Threshold and floor finish details
Interfaces we resolve
- Wall build-up and structural opening tolerance
- Access control, door position sensors and cabling
- Closers, seals and undercut against ventilation strategy
- Junctions with skirting, panelling and glazing frames
- Threshold levels and floor finish changes
- Marking, labelling and handover documentation
Sequence
How the work runs.
- 01
Schedule reconciliation
Cross-check of drawings, fire strategy, ironmongery and access control requirements.
- 02
Survey
Structural opening survey and tolerance record.
- 03
Shop drawings
Doorset and screen details, frame types, fixings and threshold conditions.
- 04
Samples
Finish samples and a sample doorset for approval where the scheme repeats.
- 05
Production and supply
Manufacture or supply of the specified tested assembly, with its evidence.
- 06
Quality control
Component check against the schedule, labelled and packed by location.
- 07
Installation
Installation, adjustment and ironmongery fitting by opening.
- 08
Handover
Final schedule, certificates for the supplied assemblies and maintenance information.
Control
Where the risk actually sits.
The assembly is the certificate
A rated doorset is only rated as the tested assembly, complete with its ironmongery and seals. We keep the specified assembly intact and we do not substitute components inside it without the manufacturer's evidence.
Schedule reconciled against the drawings
Every opening is reconciled between the architectural drawings, the fire strategy and the ironmongery schedule before ordering, which is where the discrepancies surface.
Openings surveyed before manufacture
Structural openings are surveyed and recorded, so frames arrive to fit rather than being packed out on site.
Before pricing
What we need to see.
Send what exists today. We will tell you what is still required rather than price around the gaps.
- Door and glazing schedules
- Fire strategy and acoustic requirements per opening
- Ironmongery and access control schedules
- Wall types and opening dimensions
- Programme for approval and delivery
- Whether installation is in our scope
Evidence
Projects from the register.
Questions
What clients ask about this scope.
Related
Where to go next.
Send your specification
Send the drawings and the specification.
Send the package drawings, the specification and the programme date. We will confirm what is buildable as drawn, what needs development and what we would need to see before pricing.


