Abu Dhabi International Airport terminal interior with vaulted latticed ceiling and stone floor

Specialist main contractor

Luxury interior fit-out under one accountable structure.

Método coordinates design development, MEP, manufacturing, specialist packages, fit-out, FF&E, logistics, installation and handover through one programme and one commercial structure.

Three ways to appoint Método

Specialist package
One defined scope.
Integrated package
Several connected workstreams.
Main contract
One programme, one structure.

What sits under the contract

  • Design & engineering
  • MEP
  • Fit-out
  • Joinery
  • FF&E
  • Architectural elements (GRC/GRP/GRG)
  • Acoustics
  • Facade
  • Metalwork
  • Stone & surfaces
  • Doorsets & glazing
  • Lighting & mirrors
  • Logistics & installation
  • Commissioning & handover

What a luxury interior fit-out contractor is responsible for

A luxury interior fit-out contractor turns an approved design intent into a coordinated, buildable and installable project.

The responsibility is not limited to finishes. It includes controlling the interfaces between design development, building services, manufacturing, specialist packages, procurement, logistics, installation, testing and handover.

For the client, the value is a clear line of responsibility. The project still involves many specialists, but the client does not have to manage every interface separately.

Design development

The contractor develops the technical information needed to manufacture and install the work while protecting the approved design intent. That includes shop drawings, production drawings, samples, mock ups and coordinated approvals.

MEP and specialist coordination

Ceilings, joinery, lighting, fire systems, acoustics, stone, metalwork, glazing and building services cannot be resolved independently. The contractor holds the interfaces until the work is coordinated and buildable.

Manufacturing and procurement

Materials and specialist products must be specified, sampled, manufactured, and procured against the programme. Long lead items, substitutions and quality controls need to be visible before they become site problems.

Installation and handover

Delivery is complete only when the work is installed, tested, commissioned, documented and handed over. Snagging, closeout information and responsibility for corrections remain part of the delivery structure.

The contracting model

Método sits between the client and every trade on the project.

Client / Developer / General contractor

Método

Specialist main contractor

Select a workstream

Design & engineering

Delivered & coordinated

We take the design intent to a buildable state and hold every interface until it is frozen.

Método delivers

  • Technical development of design intent
  • Shop and production drawings
  • Material development and sample control
  • Value engineering options

Método coordinates

  • Lead designer and concept team
  • Structural and facade engineers
  • Specialist consultants (acoustic, lighting, fire)
  • Authority and third-party approvals

Método does not claim to perform every trade itself. Método takes responsibility for assembling, coordinating and controlling the delivery structure, so the client manages one interface instead of dozens.

International delivery

International delivery

Our project experience spans the Middle East, Asia, Europe, the UK and the United States. The delivery model is structured around the project, using our manufacturing, procurement and specialist delivery capability as required.

FAQ

Common questions

Contact

Considering a single point of responsibility?

Tell us the scope, the programme and the constraints. We will tell you which engagement structure removes the most risk.