
Hotel Tower — Services Integration
Hospitality · Dubai, UAE · 2024
A 480-key tower where guestroom ceilings, corridors and public areas had to absorb full building services without a single visible compromise to the interior.
MEP & building services
MEP is where complex interiors are usually lost: ceilings that will not close, plant that cannot be reached, commissioning left until the finishes are already in. These case studies follow the same four stages on every project — coordination, plantroom, commissioning, handover.

Hospitality · Dubai, UAE · 2024
A 480-key tower where guestroom ceilings, corridors and public areas had to absorb full building services without a single visible compromise to the interior.

Healthcare · Abu Dhabi, UAE · 2023
A live hospital floor upgraded ward by ward, with medical gas, ventilation and power replaced around continuing clinical operation.

Leisure · Riyadh, Saudi Arabia · 2024
Services routed through sculpted composite geometry with no repeating grid — coordination carried out in the model because there were no flat surfaces to measure from.
Continue