Refurbishment and repositioning

Refurbish the hotel without losing control of the operation.

A refurbishment is judged by two things: what the guest sees when it reopens, and what the hotel lost while the work was going on. Both are programme decisions taken long before the first room closes.

We plan refurbishment around the operation: how many keys can be released at once, which risers can be touched, when the public areas can close and what has to be manufactured in advance so a closed floor is never waiting on a delivery.

Hotel lobby seating and reception area in an operating resort

Scope

What this covers.

Programme control

  • Phased refurbishment by floor, wing or stack
  • Room by room programmes with rolling handover
  • Public area closure planning and temporary arrangements
  • Procurement scheduled around shutdown dates
  • Multi-property roll-outs on a repeating cycle

Working in a live hotel

  • Guest and staff separation, protected routes and lifts
  • Noise and dust control, with agreed working hours
  • Existing service surveys before any strip-out
  • Fire, life safety and escape route continuity
  • Waste, deliveries and out of hours logistics

Reopening

  • Mock-up rooms agreed with owner and operator
  • Brand standard compliance and approvals
  • Testing, commissioning and snagging
  • Deep clean, dressing and reopening sequence
  • Defect period and remedial planning

Control

How the scope is held together.

Surveys before assumptions

Existing risers, service routes and structural conditions are surveyed and recorded before the scope is fixed. Refurbishment cost usually moves because of what was behind the wall, not what was drawn on it.

Manufacture ahead of the closure

Joinery, casegoods and stone are produced and inspected before a floor is taken out of service, so the closed period is installation only.

Revenue protected in the plan

The number of keys out of service at any point is a commercial decision. We build the programme around the number the owner and operator agree, not the number that suits the site.

Before we price

What we need from you.

Send whatever exists today. We will tell you what is missing rather than build a number on assumptions.

  • Current property drawings, or a note that none exist
  • Number of keys and the number that can be released at once
  • Which public areas can close, and when
  • Brand standard or refurbishment cycle requirements
  • Target reopening date and any seasonal constraint
  • Known condition issues from previous surveys