How to compare quotations from different furniture factories

The lowest quotation is usually the one that read the specification least carefully. Comparison has to normalise scope before it compares price.

Normalise the scope first

Put every quotation onto the same item schedule and mark exclusions, assumptions and substitutions against each line. Differences in scope explain most of the price gap before quality is even discussed.

Check what is being substituted

A quotation that switches hardware brand, fabric grade or board core will always be cheaper. That is a legitimate option, but only when it is visible and priced as an alternative.

Compare on landed cost

Ex works prices from different countries are not comparable. Freight, packing, duty and insurance move the ranking regularly, and so does the volume a product occupies in a container.

  • Ex works price
  • Packing and export crating
  • Freight and insurance to the destination
  • Duty and clearance
  • Storage and inland delivery

Test the programme claim

Ask what the lead time assumes about material availability and factory loading. A programme that assumes immediate release of every material is not a programme, it is a hope.

Hotel FF&E procurement

Send your specification

Tell us what you need made.

Send us the specification, drawings or reference material you currently have. We will review the scope, identify what is sufficiently defined to price and tell you what information is still required.