Acoustics
Acoustic interiors, built to the system the consultant specified.
An acoustic interior only performs as the tested system performs. Our role is to build the specified system exactly, in a way that survives the interfaces: penetrations, junctions, service routes and the finish the architect wants over the top of it.
We engineer, manufacture and install acoustic panelling, diffusers, reflectors, treated ceilings and integrated joinery, working to the acoustic consultant's specification and reporting anything that would compromise it.

Scope
What the package covers.
Typical applications
- Auditoria, recital halls and lecture theatres
- Studios, rehearsal and practice rooms
- Cinema and screening rooms
- Board and meeting rooms requiring speech privacy
- Prayer halls and assembly spaces
- Restaurants and lounges with a reverberation target
Design inputs required
- Acoustic consultant's specification and performance targets
- Sections showing the build-up behind the finish
- Details at penetrations, doors and service openings
- Finish specification and veneer or fabric reference
- Fire requirements applying to the linings
- Seating layout and sightline information where relevant
Interfaces we resolve
- Ventilation terminals and attenuator positions
- Lighting, AV and cable routes through treated surfaces
- Door and access panel detailing
- Junctions between treated and untreated surfaces
- Structural isolation details where specified
- Maintenance access without breaking the treatment
Sequence
How the work runs.
- 01
Survey and setting-out
Dimensional survey of the shell against the drawn geometry.
- 02
Shop drawings and engineering
Panel layouts, build-ups, fixings and every penetration, coordinated with services.
- 03
Material development
Substrate, absorber, facing and finish selected to match the specified system.
- 04
Samples and prototypes
Finish samples and, on a critical room, a section of the wall build-up.
- 05
Production
Panel manufacture in the workshop against approved drawings.
- 06
Factory quality control
Build-up, dimension and finish verified panel by panel.
- 07
Logistics
Sequenced delivery so treated surfaces arrive after wet trades are complete.
- 08
Installation and handover
Installation, consultant inspection, close-out of any observations and record information.
Control
Where the risk actually sits.
The consultant's system is the specification
We build the tested system as specified. Where a substitution is proposed we put it back to the acoustic consultant with the data, rather than deciding an equivalence ourselves.
Penetrations designed, not cut
Every penetration through a treated surface is drawn and agreed in advance, because a service opening cut on site is the usual reason a room misses its target.
Manufacture and installation held together
Panels are produced against the survey, and installed by the team that made them, which keeps the tolerance and the treatment continuous.
Before pricing
What we need to see.
Send what exists today. We will tell you what is still required rather than price around the gaps.
- Acoustic specification and performance targets
- Architectural sections and reflected ceiling plans
- Services layout affecting the treated surfaces
- Finish and fabric or veneer references
- Programme for testing and commissioning
- Who holds responsibility for acoustic testing
Evidence
Projects from the register.
Questions
What clients ask about this scope.
Related
Where to go next.
Send your specification
Send the drawings and the specification.
Send the package drawings, the specification and the programme date. We will confirm what is buildable as drawn, what needs development and what we would need to see before pricing.