Early input costs nothing and saves weeks
A manufacturer reviewing design intent will identify details that cannot be produced economically, materials with long lead times and dimensions that fight the structure.
What they need, and when
- At concept: room types, quantities and the finish palette
- At design development: elevations, sections and performance requirements
- Before production: approved shop drawings and control samples
- Before delivery: site survey, access route and installation sequence
The risk of appointing late
Late appointment forces production to start from unresolved drawings. The consequence is either a delayed benchmark or a variation after the first floor is built.