Mechanical, electrical and public health
Services and interior held under one responsibility.
On commercial interiors the coordination gap between the fit-out contractor and the services contractor is where most late change originates. Holding both removes the gap.
We deliver MEP scopes inside commercial interiors: assessment, modification, installation, coordination with the finishes and commissioning against a documented handover.

Scope
What the package covers.
Scope
- Ventilation, cooling and heating modification
- Electrical distribution, small power and containment
- Lighting, emergency lighting and controls
- Fire detection, alarm and sprinkler alterations
- Public health, drainage and water services
- Controls, metering and building management interfaces
Coordination
- Ceiling void coordination with the interior packages
- Riser and plant space capacity
- Structural penetrations and fire stopping
- Specialist equipment supplied by others
- Access for maintenance after handover
- Interfaces with base build and landlord systems
Completion
- Pre-commissioning, balancing and testing
- Witnessed commissioning where required
- Demonstration and training for the operator
- As-installed drawings and asset data
- Operation and maintenance documentation
- Defects support and seasonal commissioning
Control
Where the risk actually sits.
One coordinated ceiling plan
Services, lighting, detection and the interior finish are coordinated on a single ceiling plan before manufacture or installation begins.
Commissioning sits in the programme
Commissioning duration, witness dates and any seasonal requirements are programmed from the start rather than compressed at the end.
Fire stopping inspected before closure
Every penetration is recorded and inspected before ceilings and linings close, because it cannot be verified afterwards without opening them.
Before pricing
What we need to see.
Send what exists today. We will tell you what is still required rather than price around the gaps.
- Existing services information and O&M documents
- Proposed layout and load requirements
- Landlord or base build services strategy
- Any specialist equipment to be served
- Access, isolation and shutdown constraints
- Programme and commissioning dates
Evidence
Projects from the register.
Questions
What clients ask about this scope.
Related
Where to go next.
Discuss a commercial project
Tell us where the interfaces sit.
Tell us the asset, the scope in question and who else is contracted. We will set out where responsibility should sit and how the interfaces would be controlled.