Occupied and trading assets

Refurbishment while the building keeps trading.

In an operating asset the construction sequence is the easy part. Public safety, tenant obligations, trading hours and the reputation of the building all constrain when work can happen.

We plan and deliver refurbishment inside live buildings, with the phasing, protection and isolation strategy agreed with the operator before anyone mobilises.

Refurbishment works underway behind protection in an operating building

Scope

What the package covers.

Planning

  • Phasing and zone boundaries
  • Hoarding design and public presentation
  • Protected public and tenant routes
  • Working hours by activity type
  • Delivery, waste and craneage windows
  • Weekly look-ahead for the operator

Safety and compliance

  • Fire strategy maintained throughout the works
  • Detection and sprinkler isolations, scheduled and reinstated
  • Escape route continuity at all times
  • Permit-to-work regime with the building team
  • Dust, noise and odour control
  • Daily inspection and handback of shared areas

Delivery

  • Strip-out in contained zones
  • Structural and services alterations
  • Finishes, ceilings and lighting
  • Specialist manufacture installed out of hours
  • Commissioning without interrupting operations
  • Staged handover, zone by zone

Control

Where the risk actually sits.

The operator agrees the plan first

Nothing starts until the phasing, working hours and isolation schedule are agreed in writing with the operator and the building manager.

Every isolation is scheduled

Fire, power and cooling isolations are booked, witnessed and reinstated the same shift, and the record is issued the next morning.

Finish each zone before opening the next

Zones are completed, cleaned and handed back before the next opens, which limits the disruption footprint at any moment.

Before pricing

What we need to see.

Send what exists today. We will tell you what is still required rather than price around the gaps.

  • Building type, occupancy and trading hours
  • Areas to be refurbished and any that must stay open
  • Permitted working hours and access rules
  • Existing services information
  • Operator and landlord approval requirements
  • Target completion date and any fixed events