What factory quality control should happen before shipment

A defect found in the workshop costs an hour. The same defect found on site costs a week, and often an argument about who pays for the crane.

5 minute read

Inspect against the approved sample, not the drawing

The drawing controls dimension; the approved sample controls appearance. Both have to be present at the inspection, and the sample has to be the one that was signed.

What the inspection record should contain

  • Item reference and installation location
  • Dimensional check against the shop drawing
  • Finish check against the approved sample
  • Fixings and hardware present and correct
  • Photographs of the completed item
  • Named inspector and date

Pack for the installation sequence

Items should be marked and crated in the order they will be installed. A correctly made package delivered in the wrong order still stops the site.

Release should be a decision, not a date

Nothing should leave the workshop because the transport was booked. Release is a decision taken against the inspection record, and it is the last cheap opportunity to fix something.