What to resolve before signing an office fit-out contract

Most office fit-out disputes are visible in the contract documents before anyone starts on site. They just are not read that way.

5 minute read

Define completion as usable, not as finished

Practical completion and a usable office are not the same thing. Commissioning, IT enablement, furniture installation and cleaning all sit between them. Say which of those are included and when they happen.

Check the capacity, not the area

Cooling and power capacity against your actual occupancy density is the single most common cause of late redesign. It is a short check and it belongs before signature.

Fix the change process

Agree how a change is proposed, priced and instructed, and what the time consequence looks like. A change process without a time column always produces an argument.

Points worth closing before signature

  • Written scope boundary with the landlord and other contractors
  • Approval durations built into the programme
  • Long-lead items identified with order dates
  • Who holds IT, AV and security scope
  • The definition of completion and the move-in sequence
  • The defects period and how aftercare will run

Turnkey office fit-out

Worked example

A project from the register.

Discuss an office project

Tell us about the floorplate and the date.

Tell us the building, the area, the scope you expect to hold and the date the business needs to move. We will set out how the programme would run and what has to be resolved first.