Mixed-use

Mixed-use, where four programmes share one building.

A mixed-use building is several buildings sharing a structure, a services strategy and a set of doors. Residential, commercial, hospitality and retail all place different demands on the same cores, the same plant and the same delivery routes.

We deliver interior scopes inside mixed-use developments with the interfaces documented: what is base build, what is landlord, what is tenant and who resolves the joins.

Mixed-use tower development with podium levels

Scope

What the package covers.

Typical scope

  • Podium and arrival interiors
  • Shared lobbies, cores and circulation
  • Amenity floors serving several uses
  • Back of house shared between operators
  • Interfaces to retail and F&B units
  • Show and marketing areas within the development

Coordination we hold

  • Base build and structural interfaces
  • Shared services capacity and metering
  • Fire strategy across mixed occupancies
  • Acoustic separation between uses
  • Access, delivery and waste routes
  • Security zoning between public and private

Delivery conditions

  • Multiple approving parties
  • Sequencing against a base build programme
  • Phased handover by use and by level
  • Protection of completed areas
  • Commissioning across shared systems
  • Documentation split by asset and operator

Control

Where the risk actually sits.

Interfaces written down before mobilisation

We produce a responsibility matrix covering every junction between base build, landlord, tenant and operator, and get it agreed before starting.

One programme view

Our programme is tied to the base build milestones that actually govern us, so a slip in the shell is visible in our dates immediately.

Shared systems commissioned as one

Where fire, ventilation and security systems cross uses, commissioning is planned as a single exercise rather than per package.

Before pricing

What we need to see.

Send what exists today. We will tell you what is still required rather than price around the gaps.

  • Development plans and the uses on each level
  • Base build programme and current status
  • The scope you expect us to hold
  • Other contractors already appointed
  • Approval parties and their requirements
  • Target opening or occupation dates

Questions

What clients ask about this scope.

Discuss a commercial project

Tell us where the interfaces sit.

Tell us the asset, the scope in question and who else is contracted. We will set out where responsibility should sit and how the interfaces would be controlled.