The usual gaps
- Fire stopping at penetrations through demise walls
- Modification of base build controls and metering
- Detection reconfiguration for a new layout
- Ceiling and lighting alterations at the demise line
- Reinstatement obligations at lease expiry
- Commissioning of shared systems after tenant works
Fix it in the licence for alterations
The licence is the right place to record scope boundaries, approval durations and reinstatement obligations. Once works start, the negotiation position changes.
Record capacity, not intent
Cooling, fresh air and power capacity should be stated as a measured position for the demise, not as a general building specification. That single number prevents most later argument.