MEP case study · Healthcare
Mubarak Al-Kabir Hospital
Rumaithah, Kuwait · Delivered · MEP installation package
Scope
HVAC piping, electrical installation, plumbing
Type
Hospital MEP installation
Fabrication
Pipework supplied and fabricated to site set-out
Interfaces
Mechanical plant, building distribution, hospital areas
Supply, fabrication, installation, testing and commissioning of chilled-water and hot-water piping serving the hospital's mechanical plant, with electrical and plumbing installation through the designated areas.
01 — Coordination
Piping routes fixed before fabrication
Chilled-water and hot-water routes were set out and agreed before fabrication, so pipework arrived on site to a surveyed grid rather than being cut to fit.
- Route survey and set-out ahead of fabrication
- Bracketing intervals and supports fixed to the set-out
- Electrical containment routes coordinated with mechanical services
- Builder's work and penetrations issued from the agreed routes

02 — Plantroom
Chilled and hot water from plant to building
Plantroom pipework, headers and valve sets were installed with access, isolation and withdrawal space held throughout the distribution.
- Chilled-water and hot-water piping installed to the mechanical plant
- Headers, valve sets and isolation arranged for maintenance
- Insulation and supports installed to specification
- Pressure testing and flushing before connection

03 — Commissioning
Balanced and witnessed
Mechanical, electrical and plumbing installations were tested and commissioned as one sequence, with results recorded and witnessed.
- Water balancing recorded against design flow rates
- Electrical distribution, lighting and power tested and certified
- Domestic water systems disinfected and tested
- Witnessed sign-off across the installed systems

04 — Handover
One document set, one accountable team
As-builts, certificates and O&M information were issued as a single package under one line of responsibility.
- As-built drawings for mechanical, electrical and plumbing
- Test and commissioning certificates issued together
- O&M manuals and warranties indexed by system
- Aftercare contact retained after completion