Rumaithah, Kuwait · Delivered · MEP installation package

Scope

HVAC piping, electrical installation, plumbing

Type

Hospital MEP installation

Fabrication

Pipework supplied and fabricated to site set-out

Interfaces

Mechanical plant, building distribution, hospital areas

Supply, fabrication, installation, testing and commissioning of chilled-water and hot-water piping serving the hospital's mechanical plant, with electrical and plumbing installation through the designated areas.

01 · Coordination

Piping routes fixed before fabrication

Chilled-water and hot-water routes were set out and agreed before fabrication, so pipework arrived on site to a surveyed grid rather than being cut to fit.

  • Route survey and set-out ahead of fabrication
  • Bracketing intervals and supports fixed to the set-out
  • Electrical containment routes coordinated with mechanical services
  • Builder's work and penetrations issued from the agreed routes
Installed services at ceiling level within the hospital
Set-out, routes agreed before anything is fabricated

02 · Plantroom

Chilled and hot water from plant to building

Plantroom pipework, headers and valve sets were installed with access, isolation and withdrawal space held throughout the distribution.

  • Chilled-water and hot-water piping installed to the mechanical plant
  • Headers, valve sets and isolation arranged for maintenance
  • Insulation and supports installed to specification
  • Pressure testing and flushing before connection
Plantroom headers, valves and pump set
Plantroom, headers and valve sets arranged for access

03 · Commissioning

Balanced and witnessed

Mechanical, electrical and plumbing installations were tested and commissioned as one sequence, with results recorded and witnessed.

  • Water balancing recorded against design flow rates
  • Electrical distribution, lighting and power tested and certified
  • Domestic water systems disinfected and tested
  • Witnessed sign-off across the installed systems
Commissioning of installed mechanical equipment on site
Commissioning, sequenced across all three disciplines

04 · Handover

One document set, one accountable team

As-builts, certificates and O&M information were issued as a single package under one line of responsibility.

  • As-built drawings for mechanical, electrical and plumbing
  • Test and commissioning certificates issued together
  • O&M manuals and warranties indexed by system
  • Aftercare contact retained after completion
Mubarak Al-Kabir Hospital after completion of works
Handover, one package, one responsible team

Services that close the ceiling,