Dubai and the United Arab Emirates

Office fit-out in Dubai, held to one line of responsibility.

Método is a specialist main contractor for commercial interiors in Dubai and across the UAE. CAT A and CAT B fit-out, headquarters floors, client suites and occupied refurbishment, with design coordination, MEP, manufacture, installation and commissioning held under one contract.

300+
Complex interiors delivered
23+
Years of delivery
UAE
Dubai, Abu Dhabi and Sharjah
Commercial building interior in Dubai

Why occupiers appoint us

A workplace is judged after move-in, not at handover.

Hospitality-grade finish

Reception, boardrooms, client suites and executive floors are built to the same standard of finish we apply to hotels. Veneer, stone, metalwork, acoustics and lighting are coordinated with the services behind them.

MEP inside the same programme

HVAC, power, data, lighting controls, AV, fire and access systems are coordinated with partitions, ceilings and joinery before the design is frozen, then tested and commissioned through the same delivery structure.

Dubai approvals treated as programme inputs

Landlord requirements, building NOCs, the relevant Dubai authority and Civil Defence requirements are identified before mobilisation. The route varies by location, so the submission programme is established against the actual building and scope.

Scope

What we deliver.

  • CAT A and CAT B fit-out
  • Headquarters and client floors
  • Workplace and collaboration space
  • MEP, AV and smart-building integration
  • Occupied and phased refurbishment
  • Approvals, testing and handover

Cost

What determines office fit-out cost in Dubai

There is no responsible single rate before the existing condition and scope are known. Floor area, shell or CAT A handover condition, MEP changes, approval route, programme, joinery, furniture and finish level all change the number. Método prices against a surveyed, coordinated scope so the client can see what is included, excluded and still undecided.

  • Base-build or shell condition
  • MEP and fire and life-safety changes
  • Partitions, ceilings, flooring and finishes
  • Bespoke joinery and FF&E
  • Authority and landlord submissions
  • Occupied working or night works
  • Programme compression and long leads

Programme

What determines the programme

A straightforward floor and a complex headquarters do not share a meaningful standard duration. The programme begins with survey, scope and authority route, then design freeze, procurement and manufacture, site works, testing and handover. Occupied projects require phasing, protected routes, noise and dust controls and clean handback.

The Método way

One line of responsibility, from first decision to final handover.

  1. 01

    Define

    Brief, scope and responsibilities.

  2. 02

    Freeze

    Design development and approvals.

  3. 03

    Make

    Procurement and manufacturing.

  4. 04

    Deliver

    Site management and installation.

  5. 05

    Close

    Commissioning and handover.

Questions

What occupiers ask in Dubai.

Discuss an office project

Tell us about the floorplate and the date.

Tell us the building, the area, the scope you expect to hold and the date the business needs to move. We will set out how the programme would run and what has to be resolved first.