Coordinated ceiling void with ductwork, sprinklers and containment above a hotel corridor

MEP case study · Hospitality

Hotel Tower — Services Integration

Dubai, UAE · 2024 · Main contract

Scope

MEP coordination, installation management, commissioning

Keys

480

Programme

18 months

Interfaces

HVAC, electrical, plumbing, fire, BMS, interiors

A 480-key tower where guestroom ceilings, corridors and public areas had to absorb full building services without a single visible compromise to the interior.

01Coordination

Ceilings resolved in the model, not on the floor

Every guestroom and corridor ceiling was modelled as one assembly — duct, sprinkler, containment, lighting and the finished plane above the guest's head. Clashes were closed in the federated model before a single hanger was drilled.

  • Federated model combining architecture, structure, MEP and interior build-ups
  • Zero-tolerance zones agreed for cove details, sprinkler heads and access panels
  • Benchmark room signed off with services live before repeat floors began
  • Builder's work openings issued once, from the coordinated model
Engineers reviewing a federated MEP coordination model on screen
Federated services model — the interface log before it becomes a site problem

02Plantroom

Plant, risers and distribution set out for maintenance

Plantrooms and risers were laid out for the maintenance route as well as the installation route: valve access, filter withdrawal and replacement paths were dimensioned before pipework was fabricated.

  • Prefabricated pipework modules delivered to a surveyed grid
  • Riser shafts set out floor by floor with fixed bracketing intervals
  • Access, isolation and withdrawal space proven on the model
  • Plant loads confirmed against the interior heat gains, not the base-build assumption
Multi-service riser with bracketed pipework, containment and insulated ducts
Riser installation — alignment and access held to the coordinated set-out

03Commissioning

Witnessed, balanced and proven before finishes closed

Commissioning ran as a planned programme, not an end-of-job scramble. Systems were flushed, balanced, integrated with the BMS and witnessed in sequence, with finished surfaces protected throughout.

  • Static and dynamic commissioning sequenced by zone, not by trade
  • Air and water balancing recorded against design tolerances
  • BMS points list proven point by point, including interlocks and alarms
  • Integrated fire cause-and-effect tested with the authority present
Building management system control room with HVAC schematics on screen
BMS integration — every point proven before handover

04Handover

One dossier, one accountable team

Handover was a document set and a walkthrough, not a negotiation: as-builts, O&M manuals, test certificates, asset registers and training were issued as one package under a single line of responsibility.

  • As-built model and drawings issued at practical completion
  • O&M manuals, warranties and asset register indexed to the room and the riser
  • Operator training delivered on the running systems, not in a classroom
  • Defined aftercare window with one point of contact
Handover walkthrough of a completed hotel corridor with tablet in hand
Handover walkthrough — the building operating as designed

Services that close the ceiling,
and the programme.