método
Resort restaurant and bar interior lit at dusk

Hospitality

Coastal Resort & Beach Club

Central Vietnam · 2023

Sector

Hospitality

Year

2023

Scope

FF&E, joinery, stone, metalwork, installation

Delivery model

Manufacture and install, single-package accountability

The brief

A resort operating to international brand standards on an exposed coastal site, with guest rooms, all-day dining, a signature bar and a beach club opening to one date.

The complexity

Marine environment, imported specifications, a compressed programme and multiple design authors working in different time zones.

The Método role

Manufacturing, procurement coordination, logistics and site installation.

The response

Specifications were reworked for coastal durability before freeze, components were prototyped and batch-produced off site, and installation was sequenced building by building to protect the opening date.

The result

Handover achieved to the operator's snagging standard with a single accountable package rather than nine separate suppliers.

Project facts

Area
18,400 m²
Programme
14 months
Materials
Teak, brass, terrazzo, rattan, natural stone
Key disciplines
Design management, FF&E, logistics
Manufacturing scope
Joinery, loose furniture, feature metalwork
Delivery scope
Shipping, site installation, snagging, handover

Delivered end to end by Método — design authority, making and installation under one line of responsibility.